Original words, traceable pages

Search the evidence

Search report text, read a short matching passage, then open the source page.

Exact phrases match first; otherwise all words must occur close together. Six excerpts maximum. Text extraction cannot search image-only charts. Warsaw uses a report transcription with missing figures and appendices.

32 matching PDF pages. Showing 6 short source excerpts. Open the document for full context.

Turkish Airlines 1951

Printed page 3. PDF page 4.

slope signal............................................... 61 5.6 Completion of the landing checklist............................................................................. 63 3
Open official document at PDF page 4Crashed during approach, Boeing 737-800, near Amsterdam Schiphol Airport, 25 February 2009

Turkish Airlines 1951

Printed page 7. PDF page 8.

actions in prepara- tion for the landing, under pressure, including ticking off the landing checklist. Standard Operating Procedures of Turkish Airlines prescribe, however, that if there is insufficient visibility, as was the case here, all of these actions should be
Open official document at PDF page 8Crashed during approach, Boeing 737-800, near Amsterdam Schiphol Airport, 25 February 2009

Turkish Airlines 1951

Printed page 10. PDF page 11.

activity and left less time available to get the approach stabilised in good time. The landing checklist was accordingly being worked on at a later point than would be normal. In addition, this flight was also a training flight, so
Open official document at PDF page 11Crashed during approach, Boeing 737-800, near Amsterdam Schiphol Airport, 25 February 2009

Turkish Airlines 1951

Printed page 27. PDF page 28.

the descend was started. Interception of the glide slope signal and execution of the landing checklist This phase (10.24:24 - 10.25:22 hours) starts with radio contact with Schiphol Tower. The aircraft intercepts the glide path. The flaps have been put
Open official document at PDF page 28Crashed during approach, Boeing 737-800, near Amsterdam Schiphol Airport, 25 February 2009

Turkish Airlines 1951

Printed page 28. PDF page 29.

made the remark `yes, not in checklist completed'. Next, he listed the items of the landing checklist that the first officer had to answer to demonstrate that they had been executed correctly. In the meantime, the horizontal tailplane of the
Open official document at PDF page 29Crashed during approach, Boeing 737-800, near Amsterdam Schiphol Airport, 25 February 2009

Turkish Airlines 1951

Printed page 45. PDF page 46.

flight system, intercepting the localizer and glide slope signals, execution of the landing checklist, speed decrease during the ILS approach, stabilised approach versus aborting the approach, line flying under supervision, call out of flight mode annunciations, recove
Open official document at PDF page 46Crashed during approach, Boeing 737-800, near Amsterdam Schiphol Airport, 25 February 2009