Swissair 111
Printed page 262. PDF page 274.
cabin. Based on the results of these inspections, the FAA launched a two-phase MD-11 Wiring Corrective Action Plan. The first phase consisted of three ADs that focused on the areas of concern highlighted in the TSB's safety advisory. Subsequently, theOpen final report at PDF page 274TSB A98H0003: In-flight fire leading to collision with water