Original words, traceable pages

Search the evidence

Search report text, read a short matching passage, then open the source page.

Exact phrases match first; otherwise all words must occur close together. Six excerpts maximum. Text extraction cannot search image-only charts. Warsaw uses a report transcription with missing figures and appendices.

3 matching PDF pages. Showing 3 short source excerpts. Open the document for full context.

Pakistan International Airlines 8303

Printed page 32. PDF page 32.

only CVR recording resumed until end of the flight. 1.1.9.2. The events mentioned after 09:36:27 are only based on the analysis of the CVR (recording and spectral analysis). The Engine No. 1 N1 frequency could not be heard on CVR
Open official document at PDF page 32Final investigation report: PIA 8303, AP-BLD

Pakistan International Airlines 8303

Printed page 53. PDF page 53.

reconfiguration phase of aircraft electrical system into EEC. CVR recovered after about 8 s at 09:36:27 due to RAT deployment and then remained available till end of flight at 09:40:18. Due to non- availability of DFDR recording after 09:36:17, both
Open official document at PDF page 53Final investigation report: PIA 8303, AP-BLD

Pakistan International Airlines 8303

Printed page 143. PDF page 143.

was a transient CVR shutdown at 09:36:19. The CVR was then recovered (after 8 s) at 09:36:27 and remained powered until the ground impact. This is consistent with a nominal reconfiguration of the electrical system in EEC. Final Report -
Open official document at PDF page 143Final investigation report: PIA 8303, AP-BLD