Original words, traceable pages

Search the evidence

Search report text, read a short matching passage, then open the source page.

Exact phrases match first; otherwise all words must occur close together. Six excerpts maximum. Text extraction cannot search image-only charts. Warsaw uses a report transcription with missing figures and appendices.

3 matching PDF pages. Showing 3 short source excerpts. Open the document for full context.

Japan Air Lines 123

Printed page 130. PDF page 141.

Dec.5, 1985) In reference to the aft pressure bulkhead, an inspection program beyond the ‘usual visual inspection should be established to detect the extent of possible multiple site fatigue cracking. f) Evaluation of the fail-safe ¢riteria of the domed aft
Open official document at PDF page 141AAIC final report: Japan Air Lines Boeing 747SR-100 JA8119

Japan Air Lines 123

Printed page label not indexed. PDF page 276.

inspection and repairs are conducted for the portions concerned. The post-flight check is usually made by three personnel in about 50 minutes, 2.4.2 A Maintenance This maintenance is usually done within 250 flying hours. As shown in the table above,
Open official document at PDF page 276AAIC final report: Japan Air Lines Boeing 747SR-100 JA8119

Japan Air Lines 123

Printed page label not indexed. PDF page 281.

defects and their symptoms by detailed observation on a Particular area. For this reason usually a visual distance is necessary. Defects or symptoms expected to be discovered by this inspection are microscopic abnormality caused in structural materials or elements: for
Open official document at PDF page 281AAIC final report: Japan Air Lines Boeing 747SR-100 JA8119