G-ONEE: electrical failures and unreliable airspeed
Printed page label not indexed. PDF page 1.
L1 door had been left open during rain. The investigation was unable to determine the exact path that water took from the cargo deck floor to the GCUs, but a number of weaknesses © Crown copyright 2026 1 All timesOpen official document at PDF page 1AAIB final report: G-ONEE