G-ONEE: electrical failures and unreliable airspeed
Printed page label not indexed. PDF page 2.
Bulletin: G-ONEE AAIB-29853 in the water ingress protection measures were found that could have caused or contributed to the water ingress. There have been previous events of water ingress into GCUs and other events of water contamination of the electrical/electronicOpen official document at PDF page 2AAIB final report: G-ONEE