Original words, traceable pages

Search the evidence

Search report text, read a short matching passage, then open the source page.

Exact phrases match first; otherwise all words must occur close together. Six excerpts maximum. Text extraction cannot search image-only charts. Warsaw uses a report transcription with missing figures and appendices.

33 matching PDF pages. Showing 6 short source excerpts. Open the document for full context.

G-ONEE: electrical failures and unreliable airspeed

Printed page label not indexed. PDF page 1.

deck floor. The water led to the GCUs commanding contactors to open, which isolated AC Bus 1 and 4. Water had entered the main cargo deck prior to departure because the L1 door had been left open during rain. The
Open official document at PDF page 1AAIB final report: G-ONEE

G-ONEE: electrical failures and unreliable airspeed

Printed page label not indexed. PDF page 2.

The commander advised ATC they had an electrical problem and around four minutes later AC Bus 1 lost power, causing the loss of the Cockpit Voice Recorder (CVR) for the remainder of the flight. During the next 20 minutes, the
Open official document at PDF page 2AAIB final report: G-ONEE

G-ONEE: electrical failures and unreliable airspeed

Printed page label not indexed. PDF page 3.

Bulletin: G-ONEE AAIB-29853 The QRH procedure implied that with the cumulative failure of AC Bus 1 and AC Bus 4, the pitot probe heaters on both sides of the aircraft would be inoperative (Figure 1). It states ‘Avoid icing conditions'
Open official document at PDF page 3AAIB final report: G-ONEE

G-ONEE: electrical failures and unreliable airspeed

Printed page label not indexed. PDF page 4.

multiple AC bus failures so the crew combined the information from elec ac bus 4 and elec ac bus 1 (Figure 1) to understand the system failures, specifically the possibility that all flight instrument indications may become unreliable. Figure 1
Open official document at PDF page 4AAIB final report: G-ONEE

G-ONEE: electrical failures and unreliable airspeed

Printed page label not indexed. PDF page 7.

CVR was lost approximately 19 minutes into the flight when its only source of power, AC Bus 1, was lost. Central Maintenance Computer (CMC) messages were automatically transmitted from the aircraft during the flight using the aircraft manufacturer's Airplane Health
Open official document at PDF page 7AAIB final report: G-ONEE

G-ONEE: electrical failures and unreliable airspeed

Printed page label not indexed. PDF page 8.

sensor and AOA is Angle of Attack sensor) The data in Figure 4 shows the timings for when AC Bus 1 and 4 were powered and unpowered, and it shows that the cabin altitude started climbing while the aircraft was
Open official document at PDF page 8AAIB final report: G-ONEE