G-ONEE: electrical failures and unreliable airspeed
Printed page label not indexed. PDF page 1.
deck floor. The water led to the GCUs commanding contactors to open, which isolated AC Bus 1 and 4. Water had entered the main cargo deck prior to departure because the L1 door had been left open during rain. TheOpen official document at PDF page 1AAIB final report: G-ONEE